Electropar
Home Terms & Conditions
  • Markets
    • Energy
      • Energy Product Catalogues
      • Training - Application Videos
      • S&C Electric Product Solutions
      • Salisbury By Honeywell
      • Connector Products Inc. (CPI)
      • Cellpack
      • Madi Lineman Tools
    • Communications
      • Communication Catalogues
      • Communication Videos
    • Industrial
      • Components Catalogue NZ
      • R.Stahl Products
      • CMP Products
      • Newson Gale
      • e2s Warning Signals
      • Cabur
      • Dow Corning - MolyKote
      • Grafoplast
      • Roxtec Sealing Solutions
      • Pentair Solutions
      • Hazardous and Industrial Vessel & Container Heating
      • LMK Thermosafe
    • Fire Extinguishing & Suppression
      • DSPA Extinguishing Systems
      • DSPA 5 Series
      • DSPA 8 Series
      • DSPA 11-1-11-2-11-3
      • DSPA 11-4
      • DSPA 11-5, 11-6
      • DSPA Video Archive
      • DSPA Brochures & Manuals
      • KBS Passive Fire
    • Rack Technologies
      • Rack Technologies Catalogues
    • Marine
      • Karl Dose
    • Special Industries
      • Agriculture
      • Solar
    • Engineering Services
    • Case Studies
      • Greenbank 275kV
      • NIGUP 400kV
      • Western 500kV Development
      • Implosive Connectors
      • High Voltage Underhung Busbar System
      • Radio Interference Voltage Testing
  • Promotional Brochures
    • Promotional Brochures
    • Trade Shows & Events
  • About Us
    • Electropar - PLP
    • Policies
      • Quality, Health & Safety
    • Manufacturing Operation
    • Factory Production
      • Fabrication
      • Machining
      • Metal Forming
      • Mixing
      • Kitting
      • Packing
      • Engineering Workshop
      • Traceability and Verification
  • International Operations
    • Americas
      • PLP U.S.A/World Headquarters
      • PLP Brazil
      • PLP Canada
      • PLP Mexico
      • PLP Argentina
    • EMEA
      • PLP Great Britain
      • PLP Poland
      • PLP South Africa
      • PLP Spain
    • Asia Pacific
      • PLP Australia
      • PLP China
      • PLP Indonesia
      • PLP Malaysia
      • PLP Thailand
      • PLP New Zealand
  • Support & Contact
    • Contact Us
      • Auckland Office
      • Wellington Office
      • Christchurch Office
  • Document Archive
    • Video Archive
    • Newsletter Archive
      • Emailed HTML (Achived)
      • Newsletters (Archived)
    • News

High Voltage Underhug BusBar System

Phase to Phase insulated short Circuit testing Project

During 2008 and 2009 Electropar has been working closely with Transmission Network Service Provider (TNSP) Transpower NZ Ltd, on a ground breaking substation project. Together, the two company’s have embarked upon a programme to mathematically validate and then short circuit test a full size bay width of phase to phase insulated 220kV 200mm OD (4000amp) busbar and interplant connections at 25kA, 31.5kA and 40kA/3s fault levels.

On the strength of a convincing commercial argument,Transpower and Electropar  desired  to  prove  that  phase to phase insulation in transmission substations is not just technically possible; it is the future of design for delivering the best value Transmission Assets. The commercial argument was based on the reduction in  quantity  of  foundations  /  civil  works  in  addition to shrinking the footprint of the air insulated switchyard. Financial analysis indicated that the cost saving in civil works, electrical equipment and real estate was substantial enough to warrant the investment in a development programme.

Verify Critical Load Points
Before practical test could be considered though, the first milestone was to have the fundamental design elements examined and ratified by an independent and suitably qualified consultant. The analysis centred around the mechanical withstand of the system and was completed by Beca Carter (Auckland) in the third quarter of 2008. The Beca work was then peer reviewed by Maunsell prior to Christmas 2008. Subsequently all parties agreed that the mathematical calculations indicated the system would withstand the short circuit forces generated under Transpower’s worst case fault scenario. However, to provide an additional level of confidence a finite element analysis (FEA) was completed to further verify critical load points within the system.

Installed In A Real Substation
As a result of  gaining  agreement  that  technically  the  High Voltage Underhung Busbar System was feasible, Stage 2 of the project  has  been  completed;  ‘Practical   short   circuit   testing   of the busbar system’. The testing took place at Powertech Lab’s in Vancouver, Canada (http://www.powertechlabs.com) in June 2009 after a global search for laboratory’s  with  capability  to  complete this challenging scope. At Powertech Labs,  Electropar  built  a  full bay of 220kV (see photo) utilising Transpower’s  standard  cage type concrete foundations, steel support structures, post insulators and Electropar’s rigid bus / flexible conductor fittings so that the performance of all components of the system as would be installed in a real substation can be validated.

Under Varying Fault Conditions
The Electropar / Transpower project team were responsible for the measurement of the loads and displacements of the system under varying fault conditions, and used a combination of high speed camera’s, still camera’s video and fibre optic sensors for data acquisition. In all, 85 short circuit tests were completed over a 5 day test period between 25kA/0.3s and 63kA/1sec, including long duration tests at 40kA/3s. The system performed in accordance with expectation and as a result the High Voltage Underhung Busbar System is being seriously considered for an upcoming greenfields 220kV site.

Undergoing Detailed Analysis
Some incredible footage of HV systems under incredible short circuit loads  has  been collected  as  a result  of  the testing.  This footage, and the strain data collected (1 Terrabyte!) is currently undergoing detailed analysis. However, in addition  to  verifying the performance of the High Voltage Underhung Busbar System, the testing has also verified the short circuit performance of other Asset critical components such as bus support posts, jumper/ dropper connections and rigid bus clamps and fittings. The method of calculation for short circuit performance of these asset critical components is already the subject of a CIGRE working group as calculation methodologies have historically differed between and within designers and asset owners.

Summary
The successful testing underscores the performance of Electropar’s substation systems and at the same time introduces a new concept in HV substation design and operation. The new concept has been successfully tested, and has the potential to significantly lower capital cost of building substation assets. It also offers a substantial reduction in maintenance costs and improves access within the switchyard. These outcomes are achieved with a minimal loss of operational flexibility and have the potential to result a step- change for substation primary construction in NZ and Australia.
 

© 2021 Preformed Line Products. All rights reserved  |  Preformed.com  |  Privacy Policy and Terms of Use  |  Site by Tin Soldier
YouTube LinkedIn Twitter